Installation example: property protection
headliner2

The task was the protection of a car park which was contaminated by floodwater several times per year. Over a length of about 6 meters HWS-mobil was to be installed.

After examination of the static load capacity of walls and ground by the owner (municipality), the course of the flood protection was planned by HOWATEC and a foundation plan was created for the customer.
The ground shells and wall profiles had already been installed in the summer of 2011. In a room about 50 meters away, the system modules and baffle plates can be stored.

The test set-up was performed in autumn 2011. For the employees of the building yard, this was the first time. Nevertheless, the assembly of HWS-mobil was completed in no more than 15 minutes.